[edit] Introduction
The term ‘plant’ refers to machinery, equipment or apparatus used for an industrial activity. Typically In construction, ‘plant’ refers to heavy machinery and equipment used during construction works.
Construction plant is generally re-useable, and so, as well as being purchased new, it may be purchased second hand or hired. The Construction Plant Hire Association suggest that, ‘The UK plant hire industry is the best established and most professional in the world, and is worth over £4 billion to the UK economy.’
However, many contractors prefer to hire only those plant items which are required to meet peak demand or specialist activities. The decision to purchase plant out-right needs to be carefully weighed up, since it must then be operated at an economic utilisation level to produce a profitable rate of return on the investment.
In other words, the more down time (time when the plant is standing idle) there is, the less value it is providing for the company, and the lower the return on their investment. However, a business may believe that by purchasing and owning outright a plant asset, they will attract more of a specific kind of work and therefore increase business.
There are a number of issues to be considered before purchasing plant:
- Whether the plant will provide an adequate rate of return on the capital employed?
- Can the company obtain the plant through some other means or it is necessary to own it outright?
- Is there the potential of hiring the plant out to others?
- Will it be possible to sell the plant on when it is no longer required?
- What are the maintenance, repair and transport costs associated with using the plant?
- Can it be securely stored when not in use?
- Will finance be necessary?
- Are there options for hire purchase or leasing?
[edit] Cash or outright purchase
This means that the plant may be paid for immediately at the time of purchase. On the company’s balance sheet it will provide a tangible asset. Whether or not this is the most profitable method of investing will depend on the company having the liquid assets required to make the purchase, and being sure that the level of return from the investment is sufficient to make it worthwhile.
[edit] Hire purchase
This involves a contract between the company and a supplier of finance. The company agrees to pay a specific 'rent' during the contract period. The title of the asset may transfer to the company at the end of this period for a previously agreed sum. While this option doesn’t require a large amount of up-front capital on the part of the company, it can involve high rates of interest.
[edit] Leasing
In this case, the title does not pass to the lessee, instead, there is a contract that states the company can obtain the use of a plant asset which is owned by the lessor in return for specified rent payments. The two forms of lease appropriate for acquiring construction plant are:
[edit] Finance lease
Arrangement with a financial institution, where the rental charges cover the asset’s capital cost, in addition to a service charge.
[edit] Operating lease
Arrangement with the manufacturers or suppliers of the asset. This can be a good option where complex plant is being used that requires skilled personnel to operate and service it.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.